Cases

A Certain Machining Workshop in Zhejiang

第1张大图,单独放在第一行

A Certain Machining Workshop in Zhejiang

Solution

In a super-large machining plant in Zhejiang Province, 140 units model DWLP-8P-DS industrial energy-efficient and power-saving air conditioners are installed. Each air conditioner covers and area of 300㎡, and the temperature at the air outlet can reach as low as 18~ 21℃. Multiple cooling towers are used as outdoor units connecting to the indoor units. And by using the intelligent centralized management system for industrial air conditioners, it realizes “one key controls multiple air conditioning units" and "timed on and off", completely changed the inefficient mode of traditional manual operation.

23

45

67

89